For a 50 gallon gas tank replaced like for like, the Better configuration totals $1,485 to $2,085 installed in Frisco, priced 21 November 2026. The full ledger is below; your own answers may move it.
Water heater ledger for Frisco
50 gallon gas water heater, replaced like for like, Frisco, TX. Priced 21 November 2026. Local figures, checked 21 November 2026
| Item | Cost |
|---|---|
| Equipment (unit)50 gallon gas tank, better configuration | $850 to $1,050 |
| DeliveryIncluded in retailer installation programs | $0, included |
| Installation labourLike for like swap, same place, easy access | $475 to $775 |
| Permit and inspectionPermit, City of Frisco, verified against City of Frisco Permit, Inspection and Miscellaneous Consolidated Fee Schedule (Plumbing Permit Fees), and Ordinance No. 2026-05-40 (Technology Fee), checked 21 November 2026 | $60 |
| Haul-away of the old unitIncluded in Home Depot and Lowe's installation programs | $0, included |
| Required parts and code itemsExpansion tank, drain pan, fittings and venting allowance | $100 to $200 |
| WarrantyManufacturer tank warranty, 9 to 12 year class, included | $0, included |
| Total range, installed | $1,485 to $2,085 |
| Energy cost, 5 years (estimate)About $244 per year at the rates in the notes below | $1,220 |
| True 5-year cost of ownershipInstalled total plus 5 years of energy | $2,705 to $3,305 |
The class most DFW homes pick. A higher installed total than Good, a lower energy cost.
Not included
- Venting changes or a new flue run, if your existing venting cannot be reused: not included
- Gas line modification or upsizing: not included
- Pan or drain work beyond the standard allowance in the parts line: not included
- Drywall, ceiling or flooring repair: not included
- City re-inspection fees, if a first inspection fails: not included
Notes and assumptions:
- Energy priced at the EIA Texas all-in average of 15.91 cents per kWh and natural gas at $1.42 per therm, on the DOE test basis of about 55 gallons of hot water per day.
- Labour assumes a like for like swap: same place, same fuel, existing venting and connections reused.
- Installed ranges sit inside the published Home Depot and Lowe's installation program ranges and the DFW benchmark range in the Totalvara data file.
- The 6 percent Technology Fee cannot be resolved to one figure from the city's documents. Ordinance No. 2026-05-40 sets it at 'six percent (6%) of the base fee' and says it is 'in addition to the base fee', but neither the ordinance nor the fee schedule defines whether the base for this permit is the $50.00 issuance line alone (6% = $3.00, total $60.00) or the $57.00 the permit's two schedule lines come to (6% = $3.42, total $60.42). The $60.42 total here models the fee on the full $57.00, the reading that treats the permit's whole schedule fee as its base fee; the defensible range is $60.00 to $60.42. One question to Frisco Building Inspections settles which base the permitting system applies.
Sources: Home Depot and Lowe's published installation programs, DFW contractor benchmark ranges, EIA Texas energy rates, Totalvara DFW data file (dfw-pricing-2026-11), checked 21 November 2026. Prices change. This is an estimate for planning, not a quote.
This is an estimate, not a quote or a fixed price. The total shown is a range for the scope and assumptions listed above, based on prices and rates checked for the Dallas Fort Worth area on 21 November 2026. It includes the items listed and excludes the items listed under "Not included". Only an on-site assessment by a licensed contractor can give you a firm price, and that price may be higher or lower.
True 5 year cost, compared
Installed total plus 5 years of energy, for 50 gallon gas water heater, replaced like for like in Frisco. Bar length uses the middle of each range; the figure beside each bar is the full range.
Local notes: permits in Frisco
| Water heater permit, City of FriscoVerified against City of Frisco Permit, Inspection and Miscellaneous Consolidated Fee Schedule (Plumbing Permit Fees), and Ordinance No. 2026-05-40 (Technology Fee), checked 21 November 2026 | $60 |
| HVAC permit, City of FriscoVerified against City of Frisco Permit, Inspection and Miscellaneous Consolidated Fee Schedule (Mechanical Permit Fees), and Ordinance No. 2026-05-40 (Technology Fee), checked 22 November 2026 | $81 |
Water heater permit verified against City of Frisco Permit, Inspection and Miscellaneous Consolidated Fee Schedule (Plumbing Permit Fees), and Ordinance No. 2026-05-40 (Technology Fee) (fee schedule), checked 21 November 2026.
The 6 percent Technology Fee cannot be resolved to one figure from the city's documents. Ordinance No. 2026-05-40 sets it at 'six percent (6%) of the base fee' and says it is 'in addition to the base fee', but neither the ordinance nor the fee schedule defines whether the base for this permit is the $50.00 issuance line alone (6% = $3.00, total $60.00) or the $57.00 the permit's two schedule lines come to (6% = $3.42, total $60.42). The $60.42 total here models the fee on the full $57.00, the reading that treats the permit's whole schedule fee as its base fee; the defensible range is $60.00 to $60.42. One question to Frisco Building Inspections settles which base the permitting system applies.
Total cost calculator
Answer only what a homeowner knows. Totalvara prices the job from its DFW data file and shows every line.
Already have a quote? Check it against the same dataset range, line by line, and see what it leaves out.
Want quotes against this total?
See your total first. No phone number is needed to see a price. If you want local firms to quote against it, send one request here.
What happens to your information. We collect your name, phone, email and ZIP only to prepare your estimate and, if you agree below, to pass your request to local contractors and lead partners so they can contact you with a quote. We never ask for bank, card, Social Security or income information on this form.
How Totalvara makes money. Totalvara does not charge you. The contractor or network that receives your request pays Totalvara a fee for the referral. That fee does not change the price you are quoted, and it does not require you to hire anyone. Totalvara does not list every contractor in Dallas Fort Worth, only participating ones, and a contractor's payment never changes the cost figures we publish.
Your request is stored securely when you submit it. It is passed on only under the consent you give below, and we will tell you who received it.
No obligation. Firms provide their own quotes and prices.